Legislative Excerpt:
WSBC Regs Part 34.3 Rope access plan
(1) Before a rope access system is installed or used in a workplace, a written rope access plan must be prepared and be available at the workplace.
(2) The rope access plan must include all of the following information:
(a) the hazards associated with the work to be performed;
(b) how the hazards and associated risks will be eliminated or controlled;
(c) a description of the rope access system to be used at the workplace;
(d) a description of the types and locations of anchorages to be used at the workplace;
(e) the procedures to be used to assemble, maintain, inspect, use and disassemble the rope access system;
f) the name and duties of each member of the work team;
(g) the appropriate personal protective equipment to be used;
(h) the emergency response, evacuation and rescue procedures.